Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpTab is deprecated since version Redux 4.3! Use Redux::set_help_tab( $opt_name, $tab ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpSidebar is deprecated since version Redux 4.3! Use Redux::set_help_sidebar( $opt_name, $content ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131
The International Academy Amman – ConEx

The International Academy Amman

The International Academy Amman

The International Academy Amman (IAA) is an independent co-educational day school; one of Her Majesty Queen Rania Al Abdullah’s organizations. 

ConEx led the finishing works of the IAA commencing in October 2006 and completing the works in July 2007. 
The package included both the Secondary School block, the Theatre, Cafeteria building, the primary school, administration, Prayer, and Nurse block building which was included the Plasting works, flooring, painting, aluminum works, Steel Canopy, Catwalk, Sunscreen, Texture paint, internal painting, metal bridge, Seats, Carpet, Linoleum Parquet and movable doors systemwith a total built up area of 25,000m2 for a total cost of 3.8 million USD. 


Year Completed2007

LocationAmman – Jordan