Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpTab is deprecated since version Redux 4.3! Use Redux::set_help_tab( $opt_name, $tab ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpSidebar is deprecated since version Redux 4.3! Use Redux::set_help_sidebar( $opt_name, $content ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131
Tails Pumping Station – APC – ConEx

Tails Pumping Station – APC

Tails Pumping Station – APC

The Geotechnical Works consist of drilling and coring for testing, procurement and installation of steel sheet piles and steel bracing system for steel piles.

Fabricate, weld & install tubular steel piles sections

(O.D. = 1064 mm & 914 mm) including piles head and shoe reinforcing plates.

Dynamic and Static Pile Load Test. Structural Steel for pump platform & cover.

The mechanical works will involve mainly “Supply and Installation Works” and shall include “Installation Works” only for the associated Electro-Center regarding fire suppression systems and air conditioning systems included within the Electro-Center.

  1. Installation Works

The contractor shall be responsible for installing the associated pumping station Electro-Center, where this Elector-Center and all included equipment such as MCC’s, lighting fixtures inside the Electro-Center, Firefighting, Raceways, Wiring Devices, etc… shall be supplied by the Employer. In addition to Debris Boom Installation & Connection.

  1. Supply and Installation Works

All works shown on the design documents which include:

  • Vertical turbine pumps
  • Pumping station including valves, fittings, pipe supports and all other necessary accessories to make the system perform correctly and as required by the Employer.
  • Pumping station Steel Structure including all necessary Earth and Road Works, Concrete Works, Electrical Works, Instrumentation & Control Works.

Project Value: 3,816,150 USD

Project Duration: 12 months

Commencement Date: July 2017

Year CompletedIn Progress

LocationDead Sea – Jordan