Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpTab is deprecated since version Redux 4.3! Use Redux::set_help_tab( $opt_name, $tab ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpSidebar is deprecated since version Redux 4.3! Use Redux::set_help_sidebar( $opt_name, $content ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131
Replace 12” Pipe Line on Solar Pond Dams – Arab Potash Company – ConEx

Replace 12” Pipe Line on Solar Pond Dams – Arab Potash Company

Replace 12” Pipe Line on Solar Pond Dams – Arab Potash Company

Scope of works include Removal of 11 KM of carbon steel pipes and replace with new pipe with same materials type. works include disposal of old pipes, stringing and welding activities,NDT, Hydrotesting, and put in operation in full coordination with Arab Potash Harvesters shutdown periods.

Work location is divided into two parts, 8KM of pipe line replaced on solar ponds’ dams and 2KM of pipe line replaced inside Hot leach Plant over and inside pipe lines racks. 


Year Completed:  2016

Location: Dead Sea– Jordan