Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpTab is deprecated since version Redux 4.3! Use Redux::set_help_tab( $opt_name, $tab ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpSidebar is deprecated since version Redux 4.3! Use Redux::set_help_sidebar( $opt_name, $content ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131
Rehabilitation for Kufr Asad Pumping Station – Jordan Tender No. MC-004-2018 – ConEx

Rehabilitation for Kufr Asad Pumping Station – Jordan Tender No. MC-004-2018

Rehabilitation for Kufr Asad Pumping Station – Jordan Tender No. MC-004-2018

  1. Client: Mercy Corps – Jordan
  2. Main Contractor: Construction Experts Company
  3. Scope of Works:

Conduct design, provision, procurement, installation and operation of Kufr Asad Water Pump Station – Irbid. The works covered include but are not limited to the design, supply, installation, operation, provision and construction of all civil, mechanical and electrical works of Kurf Asad Water Pump Station:-

  1. 300 cubic meters water capacity reinforced concrete reservoir.
  2. Reinforced concrete pumps station building and electrical room.
  3. All type of required pumps, valves, restrainers, dismantling joins, all required flanges, flow meters, vents, reinforced steel concrete encasement, check valves, butterfly valves, gauges… etc.
  4. Electrical works.
  5. Guard / Operation room.
  6. All needed and required piping to connect and diversions to the new pump station.
  7. Over Head Crane Cap. 3 ton.
  8. Testing Hydro static testing, disinfection, chlorination, flushing, commissioning and training.
  9. Project Value: 293,735 JOD ≈ 413,711 USD
  10. Project Duration: 120 days
  11. Project Commencement Date: 10th April 2018
  12. Project Completion Date: 9th Sept. 2018