Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpTab is deprecated since version Redux 4.3! Use Redux::set_help_tab( $opt_name, $tab ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpSidebar is deprecated since version Redux 4.3! Use Redux::set_help_sidebar( $opt_name, $content ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131
Design & Build Knowledge Clubs in Rehab – ConEx

Design & Build Knowledge Clubs in Rehab

Client:                       Mercy Corps

Donor:                       UK Aid

Lump Sum Design & Build Contract – Fixed Price & Turn Key Job as per Specification. Contractor is responsible for design including detailed shop drawings & as built drawings.

Site Handover:          31.12.2018

Completion Date:    01&03.2019

Projects have been handed over on time.

The two projects works consist of design and build as per contract documents which includes the following:

Earth Works, Skeleton Works, Stone Facades, Water Proofing, Plastering, Tiles, Paintings, Wooden Doors, Steel Doors, Handrail, Steel Protection, Aluminium Windows, Moisture Resistant Suspended Mineral Fibre, Tiles, Kitchen Cabinet, Asphalt Pavement, Cement Tiles, Curbstones, Boundary Walls, Complete Sanitary Works, Lighting System, Fire Alarm Control System, Photoelectric, Smoke Detector, Manual Pull Station, Indoor & Outdoor Siren Flasher, Wall Fans, Fire Extinguisher, Emergency Light, Landscaping.

Contract Number =                          MCJ/2018/WIC/016

Contract Value =                              177,894.95 JD

Change Order =                                 57,401.05 JD

Total Project Value =                       235,296.00 JD

  • Total Area = 335 m²
  • Number of Floors = Ground floor and first floor with stair case for

the roof access and future additional floors.

  • External Works as appropriate and as appears in site assessment visit.