Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpTab is deprecated since version Redux 4.3! Use Redux::set_help_tab( $opt_name, $tab ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpSidebar is deprecated since version Redux 4.3! Use Redux::set_help_sidebar( $opt_name, $content ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131
New Broadcasting Station – ConEx

New Broadcasting Station

New Broadcasting Station

As a subcontractor for ABB of Switzerland, ConEx executed this comprehensive high power broadcasting and transmitting station for long, medium and short wave services.

Complete civil and electro-mechanical woks were carried out on this project- the necessary preparation, infra-structures, installations and auxiliary buildings, along with the installation of air-conditioning, ventilation, heating, lighting and fire fighting systems.

The other part of the project consisted of executing the civil works of the 132/22 KV and 33/11 KV sub-stations of the broadcasting station, together with an extension to the Sahab 132 KV sub-station.


Duration of Contract: 600 Calender Days

Project Value: 11.2 million USD

Year Completed:  1988

Location: Qasr-Kheranae– Jordan