Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpTab is deprecated since version Redux 4.3! Use Redux::set_help_tab( $opt_name, $tab ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpSidebar is deprecated since version Redux 4.3! Use Redux::set_help_sidebar( $opt_name, $content ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131
Mu’tah University Civilian Campus 2 – ConEx

Mu’tah University Civilian Campus 2

Mu’tah University Civilian Campus 2

The actual infra-structure works included selling up distribution networks for hot water, telephones and electrical and low current networks. The latter required generators, 33 and 11 KVA main substations and compact packaged outdoor 0,4 KVA main substations. The contract further required street lighting and systems for fire alarms and lighting protection. In addition, storm water drainage and culvert systems, a water supply network, systems for sewerage and irrigation roadworks, parking area and pavements were needed.

Extensive external works were also involved in this project throughout the university campus such as paving, external stairs, kerbs, a central fountain , relating walls and fencing.


Duration of Contract: 1100 Calender Days

Project Value: 25 million USD

Year Completed1993

Location: Al-Karak– Jordan