Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpTab is deprecated since version Redux 4.3! Use Redux::set_help_tab( $opt_name, $tab ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpSidebar is deprecated since version Redux 4.3! Use Redux::set_help_sidebar( $opt_name, $content ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131
Lajjoun Wells Water Supply Project Pipeline 3 – ConEx

Lajjoun Wells Water Supply Project Pipeline 3

Lajjoun Wells Water Supply Project Pipeline 3

The Lajjoun Wells project was finalized with the construction of seven horizontal pumps and motors at two steel structure houses 14m x 49 m each, to enhance the efficiency of the stations and their water collection process.

Two reservoirs each with a capacity of 1000m3 and a third with a capacity of 4000m3 were also constructed.

The scope of work involved also included the restructuring of the Swaqa Wells Collection, and the construction of 6 km ductile iron transmission pipes with a diameter of 600mm.

The project value exceeds four million USD & completed in seven months.


Year Completed:  2004

Location:  Damkhi– Jordan