Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpTab is deprecated since version Redux 4.3! Use Redux::set_help_tab( $opt_name, $tab ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpSidebar is deprecated since version Redux 4.3! Use Redux::set_help_sidebar( $opt_name, $content ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131
Kufranja Waste Water Reclamation Facility – ConEx

Kufranja Waste Water Reclamation Facility

Kufranja Waste Water Reclamation Facility

The scope of this particular project was the construction of a domestic waste water facility to cope with an average flow of 1.800 cubic meters per day.

Serving the towns of Anjara, Ajloun, Ein Jannah and Kufranjah, the waste water treatment plant consisted of a number of major structures and facilities including headworks, an administration building, an imhoff tank, biofilters and clarifiers.

The building of pump stations for recycling and for irrigations, a chlorination system, polishing ponds and sludge drying beds also required specialist know-how and expertise to complete this comprehensive facility.


Duration of Contract: 450 Calender Days

Project Value: 2.6 million USD

Year Completed1988

Location:  Kufranja – Jordan