Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpTab is deprecated since version Redux 4.3! Use Redux::set_help_tab( $opt_name, $tab ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpSidebar is deprecated since version Redux 4.3! Use Redux::set_help_sidebar( $opt_name, $content ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131
Irbid Grain Silo Extension Project – ConEx

Irbid Grain Silo Extension Project

Irbid Grain Silo Extension Project

ConEx has been nominated by the main contractor, Gerico-France, to execute in joint venture with Braint-France, all civil works including slip-forming works for grain silo bins, steel bridges, and underground connection culvert, modifications to existing plant, external works and roads.

This project is an extension of an existing complex of grain silo and comprises of, among other things, the construction of five silo blocks each containing nine main bins of 8, 36 meters diameter and ten small intermediate and star bins.

The capacity of each silo block (with a height of 44 meters) is 20.000 tons.


Duration of Contract: 450 Calender Days

Project Value: 9.4 million USD

Year Completed1999

Location:  Irbid – Jordan