Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpTab is deprecated since version Redux 4.3! Use Redux::set_help_tab( $opt_name, $tab ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpSidebar is deprecated since version Redux 4.3! Use Redux::set_help_sidebar( $opt_name, $content ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131
Deir Alla-Zai-Amman Water Expansion Project – ConEx

Deir Alla-Zai-Amman Water Expansion Project

Deir Alla-Zai-Amman Water Expansion Project

In collaboration with the consortium of EBARA (Japan) & ABB (Germany), ConEx was nominated as a subcontractor for civil works and erection of electromechanical works.

Scope of this works involved constructing intake structure, sluice gate, intake pump station,(60,000m3) settling basin(10m x 122m x 4.5m), and pumping station no.5 

In addition to install steel pipeline diameter 1200mm, 100mm and 300mm with the required appurtenances.

The project value exceeds four million USD and completed in eighteen months.


Year Completed:  2004

Location: Deir Alla-Zai-Amman– Jordan