Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpTab is deprecated since version Redux 4.3! Use Redux::set_help_tab( $opt_name, $tab ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpSidebar is deprecated since version Redux 4.3! Use Redux::set_help_sidebar( $opt_name, $content ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131
Construction of MCC Rooms and Steel Structure Cable Ladder Supports – Arab Potash Company – ConEx

Construction of MCC Rooms and Steel Structure Cable Ladder Supports – Arab Potash Company

Construction of MCC Rooms & Steel Structure Cable Ladder Support – Arab Potash Company

Construction of Three Motor Control Center Building including all finishing works. MCC Building constructed with height of 12 meters, including concrete Trowelled floors, security fire proof doors, water proofing system, and electrical transformer foundations. ConEx scope includes Supply, Fabricate and Install 235 Ton of steel structure for Hot Leach Factory HLP at Arab Potash Company facility for new Electrical and Automation cable ladders to serve all Hot leach Plant process area. Works include Concrete foundation and modification of the existing steel structure to accommodate the new complete Cable rack on height exceed 21 meters.


Duration of Contract: 6 months

Contract Value: 959,359 USD

ClientMCC

Year CompletedJan, 2015

LocationDead Sea – Jordan