Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpTab is deprecated since version Redux 4.3! Use Redux::set_help_tab( $opt_name, $tab ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpSidebar is deprecated since version Redux 4.3! Use Redux::set_help_sidebar( $opt_name, $content ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131
Construction of Border Posts Located At Ruqban/ Jordan – ConEx

Construction of Border Posts Located At Ruqban/ Jordan

Client: The International Organisation for Migration (IOM)

Contractor: JV Of Construction Experts Company & Abu Shreikh Contracting Company

Project Description: Construction of buildings of reinforced concrete using the bearing walls system of 25cm thickness for external walls and 15 cm for internal walls using COFFOR form works system for total area 1050 square meter, in addition to 36 concrete sheds 6m X 4m X 3m


Total Contract Value (Lump Sum Price)= 1,407,389 JOD

Change Order waterproofing, Solar water Heater, Sun Sheds, & Asphalt= 81,293 JOD

Project Handing Over = 14.05.2019

Maintenance Period till 14.05.2020