Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpTab is deprecated since version Redux 4.3! Use Redux::set_help_tab( $opt_name, $tab ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpSidebar is deprecated since version Redux 4.3! Use Redux::set_help_sidebar( $opt_name, $content ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131
APC/JBC GAS PIPELINE PROJECT – ConEx

APC/JBC GAS PIPELINE PROJECT

APC/JBC GAS PIPELINE PROJECT

Earth Works: Construction of 26,000 meters length (208,000 m2) Right of way including cutting, filling, grading, dozing, in addition to 120,000 m3 imported materials for stabilization.

Earth Works: Trench excavation for 26,000 KM pipe line in various types of soil (Mud, Sand, Clay, rock, etc…), 16,000 km located below water table by 1.0 meters. Works include bedding, padding with soft sand for quantity of (65,000 m3), and trench backfilling and reinstatement works.

De-watering activities include installation of temporary pumps, shoring and continuous operation. for 16 km trenching, 24/7.

Structural works: construction of all structural works for two gas receiving stations, and one intermediate block valve with area of 6,250 m2. Work includes concrete foundations, steel structure works, fencing, internal infrastructures (roads, curb stones, and landscaping).


Main Contractor: GUNSAYIL Insaat Ticaretve Sanayi LTD. STI.

Contract Value: 12,770,452 USD 

ConEx Share: 2,216,000 USD

Date of Start: 01.05.2015

Year Completed:  2016

Location: Dead Sea– Jordan