Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpTab is deprecated since version Redux 4.3! Use Redux::set_help_tab( $opt_name, $tab ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Deprecated: Function Redux::setHelpSidebar is deprecated since version Redux 4.3! Use Redux::set_help_sidebar( $opt_name, $content ) instead. in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the construct domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/conexjo/public_html/wp-includes/functions.php on line 6131
APC Internal Gas Distribution Network – ConEx

APC Internal Gas Distribution Network

APC Internal Gas Distribution Network

APC Internal Gas Distribution project is a natural gas feed project and it was designed to provide APC ( HLP, CCP1, and CCP2) Production Facilities with more than 20,000 Sm3/hr of Natural Gas, Project Designed to reduce the  production costs and to enhance APC’s a competitiveness in the global market, ConEx work scope was design, supply, fabrication, welding and erection of special type of carbon steel pipes called “low temperature carbon steel pipes” according to AMSE 31.3 and ASME IX with 100% NDT of Radiographic test (RT), Ball valves with all accessories. All pipes have been protected from sever environmental conditions by special rapping system supplied by DENSO-UK.

installed pipes with Approx. 1500 meters length , and 320 weld joints with different sizes (from 2” up to 12”) were accomplished by highly skilled engineers and technicians. ConEx has archived very high quality record with repair percentage less than 2% and with no cut out.

All Gas network was hydro-tested, flushed, cleaned and purged with nitrogen in according with international standards.

ConEx has installed and erect various type of Gas Skids for all end consumers like ( Boilers, Dryers and compactors).

Project completed and handed over to the client under supervision of highly reputable international consultant located in Belgium.


Project Value: 1.5 M USD

Project Commencement Date: 6th May 2016

Project Duration: 240 days

Project Handover date : 5th January 2017

Year Completed:  2017

Location: Dead Sea– Jordan